Hale Middle School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

 Architect:  Kenneth Hahn Architects  

Contractor:  
Related Documents
  •  Hale Middle
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Hale Middle School
The Educational Specifications package was approved by the Board of Education on July 24, 2017. The project is now in the Schematic Design phase.
Read More »

Project Budget

Hale

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$1,201,695

$1,201,695

$0

$157,500

Construction

$10,080,889

$10,080,889

$0

$65,670

Misc.

$66,761

$66,761

$0

$0

Contingency

$2,002,826

$2,002,826

$0

$0

TOTAL:

$13,352,171

$13,352,171

$0

$223,170