Bryan Middle

Scope

8210 South 42nd Street
Omaha, NE 68147
Phone: (402) 557-4100

Bryan Middle School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

 Architect:  Holland Basham Architects

Contractor:  
Related Documents
  •  Bryan Middle
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Bryan Middle School
The Schematic Design package was approved by the Board of Education on August 21, 2017. The CM@R interview selection was approved by the Board of Education on August 21, 2017. The project is currently in the Design Development phase.
Read More »

Project Budget

Bryan MS

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$1,311,326

$1,311,326

$0

$17,452

Construction

$11,000,570

$11,000,570

$0

$82,258

Misc.

$72,851

$72,851

$0

$0

Contingency

$2,185,544

$2,185,544

$0

$0

TOTAL:

$14,570,291

$14,570,291

$0

$99,710