Central High

Scope

124 North 20th Street
Omaha, NE 68102
Phone: (402) 557-3300

Central High School is scheduled to receive fire, life safety, security & technology upgrades as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:  Alley-Poyner Macchietto Architecture 
 
Contractor:  McGill Restoration  &  Mark VII Enterprises
Related Documents
  •  Central High
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Central High School
The construction work is ongoing with exterior masonry restoration, access control, and door hardware modifications work being performed. The fire alarm system reached substantial completion in January 2017. The access control system along with the door hardware modifications are scheduled to be complete in May 2017.
Read More »

Project Budget

Central

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$457,553

$457,553

$0

$303,006

Construction

$4,600,954

$4,600,954

$0

$2,796,913

Misc.

$25,419

$25,419

$0

$0

Contingency

$0

$0

$0

$0

TOTAL:

$5,083,926

$5,083,926

$0