Bryan High School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:  TACK Architects

Contractor:  
Related Documents
  •  Bryan High
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Bryan High School
The Schematic Design package was approved by the Board of Education on August 21, 2017. The CM@R interview selection was approved by the Board of Education on August 21, 2017. The project is currently in the Design Development phase.
Read More »

Project Budget

Bryan HS

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$709,559

$709,559

$0

$2,040

Construction

$5,952,410

$5,952,410

$0

$145,245

Misc.

$39,420

$39,420

$0

$0

Contingency

$1,182,598

$1,182,598

$0

$0

TOTAL:

$7,883,987

$7,883,987

$0

$147,285