Benson High Magnet 

Scope

5120 Maple Street
Omaha, NE 68104
Phone: (402) 557-3000

Benson High School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:   Leo A Daly

Contractor:  CM@R - Hausmann Construction
Related Documents
  •  Benson High
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Benson High School
The temporary classroom portables are set on the south side parking lot and are being utilized as classroom space for the 2017/2018 school year. The Phase 2 interior building construction work was complete in August 2017. The Phase 3 interior building construction work started in August 2017 and is scheduled to be complete in December 2017.
Read More »

Project Budget

Benson

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$905,966

$856,771

$49,195

$638,364

Construction

$9,509,324

$9,657,581

($148,257)

$3,733,298

Misc.

$50,331

$31,932

$18,399

$1,714

Contingency

$0

$0

$0

$0

Site Acquisition

$100,663

$20,000

$80,663

$0

TOTAL:

$10,566,284

$10,566,284

$0

$4,373,376