Saratoga Elementary School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:  DeOld Andersen Architecture

Contractor:   Miller Electric Company
Related Documents
  •  Saratoga Elementary
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Saratoga Elementary School
The School will be renovated to serve the ILP (Integrated Learning Program). The scope of work consists of remodeling classrooms to serve K-12 students. The construction work was substantially complete in August 2017 and the School is being utilized as classroom space for the ILP.
Read More »

Project Budget

Saratoga

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$2,000

$34,250

($32,250)

$28,170

Construction

$401,292

$449,042

($47,750)

$94,980

Misc.

$95,000

$15,000

$80,000

$0

Contingency

$0

$0

$0

$0

TOTAL:

$498,292

$498,292

$0

$123,150