Oak Valley Elementary

Scope

3109 Pedersen Drive
Omaha, NE 68144-3985
Phone: (402) 697-0690

Oak Valley Elementary School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect: Kenneth Hahn Architects 

Contractor:  Lueder Construction Company
Related Documents
  •  Oak Valley Elementary
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Oak Valley Elementary School
The steel erection and exterior masonry work started in August 2017. The pre-cast concrete roof structure work is scheduled to be complete in September 2017. The three (3) temporary classroom portables construction work was complete in August 2017 and these are being utilized as classroom space.
Read More »

Project Budget

Oak Valley

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$493,190

$489,950

$3,240

$363,220

Construction

$7,334,305

$7,191,688

$142,617

$1,435,853

FF&E

$0

$122,436

($122,436)

$117,660

Misc.

$27,399

$50,820

($23,421)

$15,351

Contingency

$0

$0

$0

$0

TOTAL:

$7,854,894

$7,854,894

$0

$1,932,083