Hartman Elementary

Scope

5530 North 66th Street
Omaha, NE 68104-1599
Phone: (402) 572-1966

Hartman Elementary School is scheduled to get fire, life safety, security and technology upgrades; capital improvements and an addition to increase the current capacity by four classrooms as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architecht:   

Contractor:  
Related Documents
  •  Hartman Elementary
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Hartman Elementary School
The Educational Specifications package was approved by the Board of Education on August 21, 2017. The project is now in the Schematic Design phase.
Read More »

Project Budget

Hartman

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$634,822

$634,822

$0

$43,706

Construction

$5,325,455

$5,325,455

$0

$0

Misc.

$35,268

$35,268

$0

$0

Contingency

$1,058,037

$1,058,037

$0

$0

TOTAL:

$7,053,582

$7,053,582

$0

$43,706