Dodge Elementary

Scope

3520 Maplewood Blvd.
Omaha, NE 68134-4562
Phone: (402) 572-9005

Dodge Elementary School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:   

Contractor:  
Related Documents
  •  Dodge Elementary
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Dodge Elementary School
The Educational Specifications package is scheduled to go to the Board of Education for approval on September 6, 2017.
Read More »

Project Budget

Dodge

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$520,120

$520,120

$0

$0

Construction

$4,363,227

$4,363,227

$0

$0

Misc.

$28,896

$28,896

$0

$0

Contingency

$866,866

$866,866

$0

$0

TOTAL:

$5,779,109

$5,779,109

$0

$0