Crestridge Elementary School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:  BCDM Architects

Contractor:  Meco-Henne Contracting
Related Documents
  •  Crestridge Magnet Elementary
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Crestridge Magnet Elementary School
The construction work is complete and the contractor is in the closeout phase which involves punch list items. Substantial completion is scheduled to be submitted for approval to the Board of Education in September 2017.
Read More »

Project Budget

Crestridge

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$429,546

$450,711

($21,165)

$423,922

Construction

$6,669,327

$6,562,709

$106,618

$6,204,049

Misc.

$23,864

$34,317

($10,453)

$15,908

Contingency

$0

$0

$0

$0

TOTAL:

$7,122,737

$7,047,737

$75,000

$6,643,879

Crestridge Project Renovation