Belle Ryan Elementary School includes a complete replacement of the existing school with a 600 capacity school as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:  BCDM Architects

Contractor:  CM@R - Sampson 
Related Documents
  •  Belle Ryan Elementary
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Belle Ryan Elementary School
The exterior insulation finish system is ongoing and is scheduled to be complete in August 2017. The interior drywall installation along with window installation is ongoing and is scheduled to be complete in August 2017. The ceramic tile installation started in July 2017 and is scheduled to be complete in October 2017.
Read More »

Project Budget

Belle Ryan

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$1,310,116

$1,049,752

$260,364

$917,613

Construction

$15,859,886

$16,078,520

($218,634)

$7,326,535

FF&E

$1,030,261

$1,030,261

$0

$135,065

Misc.

$147,784

$189,514

($41,730)

$129,000

Contingency

$0

$0

$0

$0

TOTAL:

$18,348,047

$18,348,047

$0

$8,508,213