Blackburn Alternative Program

Scope

2606 Hamilton Street
Omaha, NE 68131
Phone: (402) 344-3385

Blackburn High School is scheduled to get fire, life safety, security and technology upgrades; capital improvements to the existing building as identified in the 2014 OPS Facilities Capital Plan.

General Information

Architect:  Farris Engineering

Contractor:  Rife Construction
Related Documents
  •  Blackburn
Table that lists the contents of the current directory
FilenameSize
  
  
  
  
  
  
  
  
  
  
  
Max file size allowed:
786.81 MB
File extensions allowed:
*.swf, *.jpg, *.jpeg, *.jpe, *.gif, *.bmp, *.png, *.svg, *.ttf, *.eot, *.woff, *.doc, *.docx, *.xls, *.xlsx, *.ppt, *.pptx, *.pdf, *.txt, *.xml, *.xsl, *.xsd, *.css, *.zip, *.rar, *.template, *.htmtemplate, *.ico, *.avi, *.mpg, *.mpeg, *.mp3, *.wmv, *.mov, *.wav
  • Uploaded % ( ) Total
  • Uploaded files: % () Total files:
  • Uploading file:
  • Elapsed time:  Estimated time:  Speed:

QuickDocs v7.0.6

School Bond Updates

Most Recent

Blackburn Alternative Program
Substantial completion was approved by the Board of Education on February 1, 2016. Project closeout documents have been submitted and transmitted to OPS. The generator project construction work along with IT equipment installation is ongoing with work scheduled to be complete in August 2017.
Read More »

Project Budget

Blackburn

BUDGET

PROJECTED COSTS

OVER/UNDER

ACTUALS

Design

$106,798

$131,361

($24,563)

$126,448

Construction

$1,384,273

$1,359,710

$24,563

$1,283,962

Misc.

$0

$0

$0

$0

Contingency

$0

$0

$0

$0

TOTAL:

$1,491,071

$1,491,071

$0

$1,410,410